Industrial and civil plants

BAGLIETTO CANTIERI NAVALI OFFICE AND SHIPYARD PREMISES

Construction of lighting, power socket, and special plant electrical systems.  Construction of mechanical, water, sanitary, air-conditioning and heating plants.

Maserati FCA

Carrying out all building and plant activities for creating new engine test cells and roller rooms inside the N° 322 Via Ciro Menotti plant in Modena.

Photovoltaic Plant for Cava Cascina Guendalina in Pozzolo Formigaro di Tortona (AL) | ATON S.r.l.

General details
MAIN CONTRACTOR: ATON S.r.l.
LOCATION: Pozzolo Formigaro – Tortona (AL) Cava Cascina Guendalina
COST OF WORKS: Euro 1,000,000

Activities
The activities carried out are part of the first 1,5 MWp module of the multi-session photovoltaic plant developed by Aton s.r.l. in a quarry.
Nominal power:  1.499,40 kWp
Area: approx 45,000 sq.m.
Forecast production: 1,700,000 kWh/year
CO2 emissions avoided: 800,000 kg/year
Type: non-integrated, fixed structure, single crystal silicon 170 Wp panels

The monitoring and remote control system acquires a series of signals “distributed” over the various MV/LV inverter electrical panels, with hard-wired parallel string boxes using intelligent terminal boards, installed in the various parts of the plant. The entire plant is managed using a PLC installed in the Control Room, which acts as a data concentrator and executor of commands and/or logics.  The system makes real-time monitoring of production by the photovoltaic field possible and, if faults occur, it visually indicates the portion of the plant that is faulty.
The Scada system is used to gather all the information so that it can be viewed both locally and at a remote workstation, via the Ethernet network.  Fault messages are conveyed via a GSM system to the maintenance operators.

Works done
– Installation and connecting up of panels
– MV/LV transformer plants
– Supply and installation of Power Socket / Lighting systems
– Supply of the Remote Control system

imp_ind-e-civili_aton

Extension of the Photovoltaic Plant for Cava Cascina Guendalina in Pozzolo Formigaro di Tortona (AL) | ATON S.r.l.

General details
MAIN CONTRACTOR: Aton S.r.l.
LOCATION: Pozzolo Formigaro – Tortona (AL) Cava Cascina Guendalina
COST OF WORKS: Euro 1,082,000

Activities
The activities carried out are part of the second 1,5 MWp module of the multi-session photovoltaic plant developed by Aton s.r.l. in a quarry.
Nominal power: 1.490,40 kWp
Area: approx 48,500 sq.m.
Forecast production: 1,700,000 kWh/year
CO2 emissions avoided: 800,000 kg/year
Type: non-integrated, fixed structure, polycrystalline silicon 230 Wp panels

The monitoring and remote control system acquires a series of signals “distributed” over the various MV/LV inverter electrical panels, with hard-wired parallel string boxes using intelligent terminal boards, installed in the various parts of the plant The entire plant is managed using a PLC installed in the Control Room, which acts as a data concentrator and executor of commands and/or logics. The system makes real-time monitoring of production by the photovoltaic field possible and, if faults occur, it visually indicates the portion of the plant that is faulty. The Scada system is used to gather all the information so that it can be viewed both locally and at a remote workstation, via the Ethernet network. Fault messages are conveyed via a GSM system to the maintenance operators.

Works done
– Installation and connecting up of panels
– MV/LV transformer plants
– Supply and installation of Power Socket / Lighting systems
– Supply of the Remote Control system

imp_ind-e-civili_aton2

Photovoltaic Plant for Torremenapace suburb of Voghera (PV) | FABBRICA ENERGIA S.r.l.

General details
MAIN CONTRACTOR: FABBRICA ENERGIA S.r.l.
LOCATION: Voghera – Suburb  Torremenapace (PV)

Activities
The activities carried out are part of the first 1,5 MWp module of the multi-session photovoltaic plant developed by Fabbrica Energia S.r.l. on what was previously agricultural land
Nominal power: 1.516,32 kWp
Area: approx 35,000 sq.m.
Forecast production: 1,700,000 kWh/year
CO2 emissions avoided: 800,000 kg/year
Type: non-integrated, fixed structure, single crystal silicon 180 Wp panels

Works done
– Supply and installation of photovoltaic panels
– Supply and installation of structures and electricity cabins
– Supply and installation of Power Socket / Light / Remote Control system cables

Multimedia plant inside spaces recovered at the Mulino Sant'Anselmo | A33 - ASTI-CUNEO

General details
MAIN CONTRACTOR: AUTOSTRADA ASTI-CUNEO S.p.A.
LOCATION: Castelletto Stura – Mulino S. Anselmo
EXECUTION: May – December 2012
COST OF WORKS: Euro 150,000.00

Activities
The installation involved creating a multimedia plant inside spaces recovered at the Sant’Anselmo Mill, in Castelletto Stura (CN). The technological and scenographic plants are part of a theme route that winds through three different halls, which recount the evolution of the area that makes up the Gesso-Stura river park, by projecting audio and video materials.

Works done
– Supply and installation of electricity distribution and lighting circuit control panels
– Supply and installation of lighting system
– Supply and installation of video and sound projectors
– Construction of electrified scenographic structures

Electrical and mechanical systems in industrial buildings in Santo Stefano Magra (SP) at the interport | LOGISTICA TIRRENIA S.p.A.

TARANTO PORT AUTHORITY - INTEGRATED LOGISTICS PLATFORM

Construction works on the logistics platform, environmental clearing of the road, the docks, and the electrical and mechanical systems.

Activities
Execution, inside the Logistics Platform, of (plumbing, electrical, lighting, fire-fighting, burglar alarm, video surveillance, photovoltaic, and refrigerated cells) plant works, and related building works for the buildings: offices, catering, porter’s home, refrigerated warehouse, ambient temperature warehouse, car parking garage and outside parking, rail system, container yard, and electricity cabins.

Creation of the CCTV and access control plant for the Port Precinct.
Cost of works:  Euro 7,214,000

FCA – FIAT CHRYSLER AUTOMOBILES

Electrical and special plants serving the new Alfa Romeo museum in Arese.

IPER – NEW SHOPPING MALL IN ARESE – PROGRAMME TO RECOVER EX ALFA ROMEO AREA

Technological plants serving the new shopping mall.

Activities
Electrical plants:
– Installation of special electricity distribution plants and related cabins
– Construction of earthing and lightning conductor systems
– Installation of partial special electrical plants (fire-detection, Evac sound diffusion, burglar alarm, CCTV and access control)

Mechanical plants:
– Construction of fire-fighting plant
– Construction of plumbing plant, hydronic ring, and drain network
– Construction of technological units
– Construction of ventilation plant
– Construction of district heating network

FABBRICA IMMOBILIARE FONDO ERASMO

Technological plants serving the students residence at the University of Turin.

Activities
Construction of electrical, special and heating fluid plants serving the entire complex.
The systems were constructed in order to achieve greater energy savings.
Maintenance and operating of the technological plants.

Works done
– Construction of the plumbing system
– Construction of the fire-fighting system
– Air-conditioning plant
– Construction of MV receiving cabin and MV/LV transformation cabin
– Construction of photovoltaic plant for producing its own energy
– Installation of the lighting system using LED lighting units, controlled by a domotics system
– Installation of smoke detection and evacuation plants
– Creation of CCTV IP plant
– Installation of structured wiring
– Installation of WiFi system to cover the entire structure
– Setting up of the Hospitality Management System
– Setting up of a Heat Regulation System
– Setting up of a Metering system for consumption for each accommodation unit.

Cost of works: Euro 3,700,000

ALESSANDRIA CALORE Srl

Construction of district hearing plant, with cogeneration, serving the city of Alessandria.

General Details
MAIN CONTRACTOR: ALESSANDRIA CALORE S.r.l.
LOCATION: Via Gandolfi, quartiere Cristo, Alessandria
EXECUTION: From August 2014 to January 2015
COST OF WORKS: Euro 625,000.00

Activities
Construction of electrical and special plants to serve the district heating and cogeneration unit.

The activities include: Construction of electricity distribution systems, lighting and power point plants, data transmission, fire detection, burglar alarms and access control, automation and remote control system.

Works done
– Supply and installation of electricity cabin
– Supply and installation of MV and LV electrical panels
– Supply and installation of MV/LV and MV/MV transformers
– Supply and installation of MV and LV power cables
– Supply and installation lighting units and power sockets
– Supply and installation data transmission system
– Supply and installation burglar alarm and access control system
– Supply and installation of fire-detection plant
– Connecting up cogenerator
– Connecting up the boilers
– Supply and installation of automation and remote control system

PIEDMONT REGION

Construction of electrical panels to serve the new Piedmont Regional Authority Building.

Design, assembly, wiring and certification of power centre panels and all sub-panels for light, power point and technological distribution plan.

Cost of works: Euro 250,000

CARREFOUR ITALIA

Construction of electrical and special plants at the Nichelino (Turin) shopping mall.

A35 – BREBEMI

Electrical and special plants to serve the new motorway link between the cities of Brescia, Bergamo and Milan.

Activities
Construction of:
– Lighting systems at toll booths and concourses
– Line plants
– Electricity supply plants along the entire section
– Technicians’ shelters
– Electricity supply, lighting and lit signage plants, to serve the Treviglio tunnel
– Special plants (fibre optic, wireless and isofrequential transmission)
– Video surveillance centre and related plants on the route (electricity and video camera plants)

A58 – TEEM External Ring-Road

Technological plants along the route and toll gates serving the new external east ring-road for Milan.

CLIENT: CONSORZIO ARCOTEEM
LOCATION: New motorway: TEEM A58 Pozzuolo Martesana (MI) and Merlino (LO)
EXECUTION: From November 2013 to April 2015
COST OF WORKS: Euro 2,064,000

Activities
Construction of electrical, mechanical, and special plants to serve the Pozzuolo Martesana and Paullo toll gates.

The activities include: Construction of electricity distribution systems, lighting and power point plants, data transmission, fire detection, burglar alarms and access control, automation and remote control system, water system, summer and winter air-conditioning system, and photovoltaic plant.

Works done
– Supply and installation of electricity cabin
– Supply and installation of MV and LV electrical panels
– Supply and installation of MV/LV transformer
– Supply and installation of MV and LV power cables
– Supply and installation electricity generator unit and UPS
– Supply and installation lighting units and power sockets
– Supply and installation data transmission system
– Supply and installation burglar alarm and access control system
– Supply and installation of fire-detection plant
– Supply and installation of water system
– Supply and installation of air-conditioning system
– Supply and installation of photovoltaic plant