casello

Euroimpianti develops and constructs various Motorway and Industrial Supervision and Remote Control Systems in the Technological Plants sector.

Integrated traffic detection, video surveillance and user information system | A7 Milano – Serravalle Aesys

General Details
Client: A7 Milano Serravalle Motorway and Milan ring roads
Execution: June 2009 – September 2013
Cost of works: Euro 9,400,000 of which 1,040,000 for Euroimpianti.

Activities
Construction of a telecommunications system, developed using Giga Ethernet with fibre optic support, and creating a trunk ring using Cisco technology and local rings using Hirshmann technology, in order to limit problems arising from faults on equipment or interruption of transmission support.

The overall system covered the three Milan ring-roads (East, West, and North) and the section of the A7 motorway from Milan to Serravalle.

Euroimpianti also saw to creating software for the control centre, providing a system that integrates the information acquired from the various plants and supports the operator in the procedures to be applied in relation to traffic disturbance events, making it possible to control the devices used to inform users.

Works done
– Installation of variable message panels
– Installation of traffic detection devices
– Installation of surveillance video circuits (CCTV)
– Installation of tunnel accident detection equipment
– Construction of telecommunications network
– Setting up of control centre.

Remote control of motorway toll gates | A5 - SAV S.p.A.

General details
MAIN CONTRACTOR: SAV S.p.A.
LOCATION: A5 – Quincinetto-Aosta Motorway

Activities
SAV’s Motorway Remote Control System adopts a centralised control model that involves gathering, processing, and integrating information on the toll gate electricity distribution plants, at the operations centre.  The Supervision System gathers the information detected, processed and transmitted by the peripheral systems located on the motorway (Toll Gate PLC), on a centralised basis, and processes the information acquired in order to avoid critical situations for the operations centre operator or the technical department.  Via this interface the operator is able to view current and past information on the remote controlled plants.

The remote controlled toll gates include:
– Aosta Nord toll gate
– Aosta Sud toll gate
– Aosta barrier toll gate
– Nus toll gate and Nus maintenance centre
– Chatillon toll gate
– Verres toll gate

Remote control of motorway tunnels and toll gates | A12 - SALT S.p.A.

General details
MAIN CONTRACTOR: SALT S.p.A.
LOCATION: A12 – Sestri Levante-Livorno Motorway

Activities
SALT’s Motorway Remote Control System adopts a centralised control model that involves gathering, processing, and integrating information on the toll gate electricity distribution plants, at the operations centre.  The Supervision System gather information detected, processed and transmitted by the peripheral systems located on the motorway, on a centralised basis –  16 Toll Gate PLCs and 25 Tunnel PLCs. It processes information acquired in order to avoid situations that are critical for the operations centre operator or the technical department.  Via this interface the operator is able to view current and past information on the remote controlled plants.

Owner's remote control for photovoltaic plants | ATON S.r.l.

Works to upgrade the Sorreley - Meysattaz open-sided Tunnel, for emergency access and training and instruction structure for emergency rescue services in tunnels - A5 - QUINCINETTO-AOSTA

General details
MAIN CONTRACTOR: SAV S.p.A.
LOCATION: QUINCINETTO – AOSTA MOTORWAY
EXECUTION: DECEMBER 2010 – JUNE 2013
COST OF WORKS: 2,132,569.33.

Activities
The tunnel was set up for operating drills by the fire brigades.
The area covered by the works is located in the Meysattaz suburb of the town of Saint Christophe at an altitude of 600 m above sea level, immediately after the municipal road that connects the centre of Saint Christophe to the Beauregard Hospital in Aosta, at the opening in the Sorreley-Meysattaz tunnel. The land to be affected by the works are indicated on sheet N° 37 of the land registry diagram for the town of Saint Christophe as lots 396 and 398, owned by the Client, S.A.V. S.p.A.

Works outside the tunnel
– Construction of a semi-basement space that will house the change rooms, ablution facilities, stores, technical rooms and electricity cabin.
– Construction of a prefabricated chalet for use as an office and meeting rooms
– Refurbishing the entrance to the tunnel
– Setting up special and remote control systems
– Setting up electrical systems
– Setting up mechanical plants

Works inside the tunnel
– Refurbishing the tunnel opening by laying a new surface and cladding the bases in reflective enamelled steel panels
– Construction of a 15 m long side duct inside, which will house the training laboratory with vehicle guards
– Forming of a recess at the end of the tunnel, which can be used by vehicles to turn around
– Creation of a filter zone and safe place to serve the Cote de Sorreley tunnel
– Setting up the fire-fighting plant
– Setting up the gas distribution plant
– Main tunnel ventilation
– Dedicated and filter and safe place ventilation
– Setting up technological plants and Wifi coverage for plant interfacing
– Setting up technological pushbutton panels.

FCA – FIAT CHRYSLER AUTOMOBILES

Electrical and special plants serving the new Alfa Romeo museum in Arese.

FABBRICA IMMOBILIARE FONDO ERASMO

Technological plants serving the students residence at the University of Turin.

Activities
Construction of electrical, special and heating fluid plants serving the entire complex.
The systems were constructed in order to achieve greater energy savings.
Maintenance and operating of the technological plants.

Works done
– Construction of the plumbing system
– Construction of the fire-fighting system
– Air-conditioning plant
– Construction of MV receiving cabin and MV/LV transformation cabin
– Construction of photovoltaic plant for producing its own energy
– Installation of the lighting system using LED lighting units, controlled by a domotics system
– Installation of smoke detection and evacuation plants
– Creation of CCTV IP plant
– Installation of structured wiring
– Installation of WiFi system to cover the entire structure
– Setting up of the Hospitality Management System
– Setting up of a Heat Regulation System
– Setting up of a Metering system for consumption for each accommodation unit.

Cost of works: Euro 3,700,000

AUTOSTRADA PEDELOMBARDA S.c.p.A.

Maintenance of the Pedelombarda motorway plants

Activities
Construction of all electrical lighting and special plants, fire-fighting plants, and ventilation of tunnels, construction of purification tanks and plants for 23 platforms for collecting storm water.

Cost of works: Euro 41,400,000

ALESSANDRIA CALORE Srl

Construction of district hearing plant, with cogeneration, serving the city of Alessandria.

CLIENT: ALESSANDRIA CALORE S.r.l.
LOCATION: Via Gandolfi, quartiere Cristo, Alessandria
EXECUTION: From August 2014 to January 2015
COST OF WORKS: Euro 625,000.00

Activities
Construction of electrical and special plants to serve the district heating and cogeneration unit.

The activities include: Construction of electricity distribution systems, lighting and power point plants, data transmission, fire detection, burglar alarms and access control, automation and remote control system.

Works done
– Supply and installation of electricity cabin
– Supply and installation of MV and LV electrical panels
– Supply and installation of MV/LV and MV/MV transformers
– Supply and installation of MV and LV power cables
– Supply and installation lighting units and power sockets
– Supply and installation data transmission system
– Supply and installation burglar alarm and access control system
– Supply and installation of fire-detection plant
– Connecting up cogenerator
– Connecting up the boilers
– Supply and installation of automation and remote control system

CARREFOUR ITALIA

Construction of electrical and special plants at the Nichelino (Turin) shopping mall.

A35 – BREBEMI

Electrical and special plants to serve the new motorway link between the cities of Brescia, Bergamo and Milan.

Activities
Construction of:
– Lighting systems at toll booths and concourses
– Line plants
– Electricity supply plants along the entire section
– Technicians’ shelters
– Electricity supply, lighting and lit signage plants, to serve the Treviglio tunnel
– Special plants (fibre optic, wireless and isofrequential transmission)
– Video surveillance centre and related plants on the route (electricity and video camera plants)

A58 – TEEM External Ring-Road

Technological plants along the route and toll gates serving the new external east ring-road for Milan.

CLIENT: CONSORZIO ARCOTEEM
LOCATION: New motorway: TEEM A58 Pozzuolo Martesana (MI) and Merlino (LO)
EXECUTION: From November 2013 to April 2015
COST OF WORKS: Euro 2,064,000

Activities
Construction of electrical, mechanical, and special plants to serve the Pozzuolo Martesana and Paullo toll gates.

The activities include: Construction of electricity distribution systems, lighting and power point plants, data transmission, fire detection, burglar alarms and access control, automation and remote control system, water system, summer and winter air-conditioning system, and photovoltaic plant.

Works done
– Supply and installation of electricity cabin
– Supply and installation of MV and LV electrical panels
– Supply and installation of MV/LV transformer
– Supply and installation of MV and LV power cables
– Supply and installation electricity generator unit and UPS
– Supply and installation lighting units and power sockets
– Supply and installation data transmission system
– Supply and installation burglar alarm and access control system
– Supply and installation of fire-detection plant
– Supply and installation of water system
– Supply and installation of air-conditioning system
– Supply and installation of photovoltaic plant

A1 – Motorway MILAN - NAPLES

Addition of a third lane between Barberino di Mugello and Calenzano. Technological plants for the Boscaccio and Colle tunnels.

Client: Pavimental S.p.A.

ut id diam dolor. ante. nunc et, consequat. mattis at sed commodo